![]() ![]() The contractor doing the work is required to sign the permit application even if they are not submitting it. Sewer contractors typically submit applications for UR and UC permits. A Public Works Permit will likely be needed. ![]() Contact UR and UC Permitting staff for guidance. Connections crossing light rail or streetcar tracks are examples. Some rare connections are so risky or complicated that they cannot be permitted under a UC Permit. Refer to the City Standard Drawings & Details Details P-250 to P-299. Examples of special connections are a deep connection riser or inside drop in a maintenance hole. Additionally, special connection requests require approval from Environmental Services engineering staff. This could include a pre-construction meeting with inspection staff or having the City maintenance crews install the connection at the main. These utilities may need to be relocated or protected during construction.ĭepending upon the sewer main’s age, material, size and/or location, UC Permit review staff may need to consult with other City staff to determine if specific permit conditions are required. Other important utilities are buried in the street, such as water, gas, and telecommunication service lines and mains. Excavation in the street increases the need for traffic control and site safety measures. This UC Permit type requires greater application review by City staff and greater construction coordination by the sewer contractor. A plumbing permit is required for the work on private property. A UC Permit is required for the work in the right-of-way. If they are in good condition, then a new development can connect directly to the existing branch if you can install the new lateral without an angle in the right-of-way. ![]() Typically, these extend from the sewer main to the curb. Many sewer mains have existing public laterals or branches. A New Lateral Connection to an Existing Branch Requires a UC Permit This occurs either when the new sewer lateral connects to an existing public connection – a City branch – or when the new sewer lateral needs to extend from the building all the way to the public sewer main. Repairing a private sewer line in the right-of-way.Ībout UC Permits (new lateral connections)Ī UC Permit is required when your property needs a new connection to the public sewer system.A lateral repair connecting to a City branch in a public alley.Repairing a sewer lateral that is connected to a public sewer on private property (usually in a public sewer easement). ![]() Other less common situations in which a UR Permit is needed: Lateral Repairs Require a UR Permit for the Work in the Right-of-Way For the portion of the work on private property, a plumbing permit (PT Permit) is required. For the portion of the repair work in the the public right-of-way or sewer easement, a UR Permit is required. About UR Permits (lateral repair permit)Ī UR Permit is required when you need to repair a sewer lateral. The Bureau of Environmental Services maintains the public sewer system and issues UR and UC permits for work in the right-of-way or in a public easement. The Bureau of Development Services permits sewer lateral work on private property through plumbing permits (PT Permit). When repairing a sewer lateral or installing a new connection, you will need separate permits for the work on private property and for work in the right-of-way. See Portland City Code 17.32 and Administrative Rule ENB-4.17 for more information on City and property owner maintenance responsibilities of the lateral in a right-of-way or public sewer easement. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |